(1) When puff machine working,

15 meters around the front and left and right of the bulking jar prohibiting personnel close up when operating. The operator must stand at

 the left and right or back of the bulking jar when operating, or at the place where it is not easy to burn personal when the thermal 

current dashed out after the cover is opened, especially when a mistake that only an aperture of the cover is open, the thermal current 

cannot dash out fiercely and hurt others or ourselves.

The wall clock should be installed in that the pressure gauge may happen to be malfunction at any time. Both the pressure gauge and the 

time should be paid attention when heating, stop heating when over the normal heating time, open the jar to bulking, cut off the air 

and power supply and remove malfunction after ensuring there is no danger.

(2) Do not touch the crust when the puffing machine is in operation, because it has super high temperature which may burn youThe airproof of this machine

 relies on several heave stripes at the mouth of the jar, therefore, such strips cannot be damaged by metal, stone and such hard 

objects, otherwise, the mouth of the jar may leak.

(3) Pay attention to the belt operation so as to prevent hurting finger. Others cannot start the puff machine when installing the belt.

 Adjust the screw under the engine when the belt is loose or too tight. Attention: rock the stick to turn the jar with even force,

 the decelerate motor is easy to be damaged if the belt is too tight or overuse of force. The damage of engine is easy to happen 

if the belt is not demounted and the positioning standstill locking pin is not well positioned when open

-jar bulking, or cause personnel accident for the turning of bulking jar.